Internship EMC Engineering - Tessenderlo, Belgium
JOB.TITLE
-
OU.DIVISION
-
EMPLOYMENT.TYPE
-
OU.LOCATION
Project description
All Melexis products must have their electromagnetic compatibility (EMC) performance checked before they are released on the market, in order to make sure that they are all compliant with the stringent international EMC standards as well as with the internal requirements of Melexis’ customers. This project will be focused on implementing and automating numerous EMC transient test setups.
You will create working automated EMC test setups for transient immunity tests that are
compliant with the international regulations, and which can be used in an optimal way
e.g., Automated calibration and parameter setting.
Your profile
Master student Industrial Engineering
Good understanding of technical documentation
Conceptual thinking
Basic knowledge of measurement equipment, LabView and GPIB communication is a must
Basic programming knowledge
Project duration
- 6-12 months (can be adapted to the requirements of the thesis)